Tasks: REV-004 账务处理一期
Input: Design documents from /specs/001-rev004-accounting/
Prerequisites: plan.md (required), spec.md (required), research.md, data-model.md, contracts/
Validation: Validation tasks are NOT optional in this repository. Every document change task set MUST include the applicable validation and ledger-sync tasks.
Organization: Tasks are grouped by user story so each document-maintenance slice can be completed, reviewed, and validated independently.
Format: [ID] [P?] [Story] Description
- [P]: Can run in parallel (different files, no dependencies)
- [Story]: Which user story this task belongs to (e.g., US1, US2, US3)
- Include exact file paths in descriptions
Path Conventions
- Main documents:
docs/design/01_Overview/,docs/design/02_Detailed_Design/,docs/design/03_Technical_Design/ - Governance documents:
docs/design/00_Management/ - Archive references:
docs/design/04_Appendix/Archive/ - Runtime guidance:
README.md,AGENTS.md,.specify/templates/
Phase 1: Setup (Shared Foundation)
Purpose: Confirm the source-of-truth set, target files, and planning artifacts before editing formal documents.
- T001 Read prerequisite governance documents
docs/design/00_Management/01_Project_Progress.md,docs/design/00_Management/02_Delivery_Standards.md, anddocs/design/00_Management/03_Task_Checklist.mdbefore formal document edits - T002 Confirm target chapters and intended updates in
specs/001-rev004-accounting/spec.md,specs/001-rev004-accounting/plan.md,docs/design/02_Detailed_Design/12_REV_Detailed.md,docs/design/03_Technical_Design/03_Interface_Design.md, anddocs/design/03_Technical_Design/01_Database_Design.md - T003 [P] Confirm source-of-truth and allowed references using
.specify/memory/constitution.md,docs/design/01_Overview/03_Summary_Design.md,docs/design/02_Detailed_Design/12_REV_Detailed.md,docs/design/03_Technical_Design/03_Interface_Design.md, anddocs/design/03_Technical_Design/01_Database_Design.md - T004 [P] Confirm scope boundary, exclusions, traceability anchors, and impacted files in
specs/001-rev004-accounting/research.md,specs/001-rev004-accounting/contracts/rev004-scenario-matrix.md,specs/001-rev004-accounting/contracts/rev004-traceability-matrix.md, anddocs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md
Phase 2: Foundational Alignment (Blocking Prerequisites)
Purpose: Prepare the common wording, structure, and traceability baseline that all user stories depend on.
- T005 Normalize common terminology, scenario names, and approval boundary wording in
specs/001-rev004-accounting/data-model.md,specs/001-rev004-accounting/contracts/if-rev-007-accounting-request.md, andspecs/001-rev004-accounting/contracts/rev004-scenario-matrix.md - T006 [P] Map shared entities and result fields from
specs/001-rev004-accounting/data-model.mdinto target update notes fordocs/design/02_Detailed_Design/12_REV_Detailed.mdanddocs/design/03_Technical_Design/03_Interface_Design.md - T007 [P] Map shared physical carriers from
specs/001-rev004-accounting/contracts/rev004-traceability-matrix.mdinto target update notes fordocs/design/03_Technical_Design/01_Database_Design.md - T008 Establish a single update checklist for validation and ledger-sync using
specs/001-rev004-accounting/quickstart.md,docs/design/00_Management/01_Project_Progress.md, anddocs/design/00_Management/03_Task_Checklist.md
Phase 3: User Story 1 - 收敛一期范围 (Priority: P1) 🎯 MVP
Goal: 在正式详细设计与执行手册中明确 REV-004 一期纳入范围、排除项、共性能力优先顺序与审批边界。
Independent Test: 审阅者仅通过 docs/design/02_Detailed_Design/12_REV_Detailed.md 与 docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md,即可确认一期纳入场景、排除项、审批边界和“共性能力先统一、场景能力再分批”的组织方式一致。
Implementation for User Story 1
- T009 [US1] Update REV-004 一期范围、排除项、共性能力顺序和审批边界 in
docs/design/02_Detailed_Design/12_REV_Detailed.md - T010 [US1] Sync REV-004 执行范围、验收入口和后续实施组织方式 in
docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md - T011 [P] [US1] Sync REV-004 一期范围摘要 and cross-references in
docs/design/01_Overview/03_Summary_Design.md - T012 [US1] Update traceability note for scoped scenarios in
specs/001-rev004-accounting/contracts/rev004-traceability-matrix.md - T013 [US1] Run
make validate-file FILE=docs/design/02_Detailed_Design/12_REV_Detailed.mdand capture result fordocs/design/02_Detailed_Design/12_REV_Detailed.md - T014 [US1] Run
make validate-file FILE=docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.mdand capture result fordocs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md - T015 [US1] Run
make check-linksand capture cross-document link result for US1 file changes - T016 [US1] Update important progress note in
docs/design/00_Management/01_Project_Progress.mdif US1 produces an important formal document change after validation passes - T017 [US1] Update REV-004 scope task status in
docs/design/00_Management/03_Task_Checklist.mdif US1 completes a tracked task or materially changes its closure condition
Checkpoint: User Story 1 is reviewable, validated, and ledger-synced independently.
Phase 4: User Story 2 - 对齐接口与数据口径 (Priority: P2)
Goal: 在详细设计、接口设计与数据库设计中统一 IF-REV-007、账单承接对象、原交易校验对象、结果表达和留痕对象。
Independent Test: 审阅者仅通过对照 docs/design/02_Detailed_Design/12_REV_Detailed.md、docs/design/03_Technical_Design/03_Interface_Design.md、docs/design/03_Technical_Design/01_Database_Design.md,即可确认 REV-004 的核心场景、请求/响应字段、物理承接口径和追溯关系一致。
Implementation for User Story 2
- T018 [US2] Update REV-004 scenario rules, result fields, and log requirements in
docs/design/02_Detailed_Design/12_REV_Detailed.md - T019 [US2] Update IF-REV-007 request/response, approval boundary, and acceptance notes in
docs/design/03_Technical_Design/03_Interface_Design.md - T020 [US2] Update REV-004 physical carrier wording for
biz_charge*,bk_transaction*, andbiz_operat_log*indocs/design/03_Technical_Design/01_Database_Design.md - T021 [P] [US2] Sync shared entity and field mapping notes in
specs/001-rev004-accounting/data-model.md - T022 [P] [US2] Sync contract details and scenario matrix notes in
specs/001-rev004-accounting/contracts/if-rev-007-accounting-request.mdandspecs/001-rev004-accounting/contracts/rev004-scenario-matrix.md - T023 [US2] Update traceability rows for interface/database alignment in
specs/001-rev004-accounting/contracts/rev004-traceability-matrix.md - T024 [US2] Run
make validate-file FILE=docs/design/02_Detailed_Design/12_REV_Detailed.mdand capture result for US2 detailed design changes - T025 [US2] Run
make validate-file FILE=docs/design/03_Technical_Design/03_Interface_Design.mdand capture result for interface design changes - T026 [US2] Run
make validate-file FILE=docs/design/03_Technical_Design/01_Database_Design.mdand capture result for database design changes - T027 [US2] Run
make check-linksand capture cross-document link result for US2 file changes - T028 [US2] Update important progress note in
docs/design/00_Management/01_Project_Progress.mdif US2 produces an important formal document change after validation passes - T029 [US2] Update REV-004 interface/database alignment task status in
docs/design/00_Management/03_Task_Checklist.mdif US2 completes a tracked task or materially changes its closure condition
Checkpoint: User Story 2 is reviewable and validated independently.
Phase 5: User Story 3 - 形成可执行交付闭环 (Priority: P3)
Goal: 在执行手册与管理台账中固化 REV-004 的后续实施顺序、验收入口、最小校验动作与台账更新触发条件。
Independent Test: 审阅者仅通过 docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md、docs/design/00_Management/01_Project_Progress.md 与 docs/design/00_Management/03_Task_Checklist.md,即可确认 REV-004 后续 tasks 的拆解依据、验收入口、最小校验动作和台账同步方式已经明确。
Implementation for User Story 3
- T030 [US3] Update REV-004 execution sequence, independent acceptance entry, and validation steps in
docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md - T031 [US3] Record REV-004 planning milestone and next-step entry in
docs/design/00_Management/01_Project_Progress.mdif US3 forms an important governance or formal delivery milestone - T032 [US3] Update REV-004 tracked checklist items and completion criteria in
docs/design/00_Management/03_Task_Checklist.mdif US3 completes or materially redefines a tracked task - T033 [P] [US3] Sync quick review and validation wording in
specs/001-rev004-accounting/quickstart.md - T034 [P] [US3] Sync task-splitting and closure assumptions in
specs/001-rev004-accounting/plan.md - T035 [US3] Run
make validate-file FILE=docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.mdand capture result for execution playbook changes - T036 [US3] Run
make validate-file FILE=docs/design/00_Management/01_Project_Progress.mdand capture result for project progress changes - T037 [US3] Run
make validate-file FILE=docs/design/00_Management/03_Task_Checklist.mdand capture result for task checklist changes - T038 [US3] Run
make check-linksand capture cross-document link result for US3 file changes
Checkpoint: All planned document updates are independently reviewable, validated, and ledger-synced.
Final Phase: Polish & Cross-Cutting Closure
Purpose: Ensure repository-wide consistency after all story slices are complete.
- T039 [P] Re-check source-of-truth alignment across
docs/design/02_Detailed_Design/12_REV_Detailed.md,docs/design/03_Technical_Design/03_Interface_Design.md,docs/design/03_Technical_Design/01_Database_Design.md, anddocs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md - T040 [P] Re-check relative links, traceability rows, and Mermaid consistency across
docs/design/01_Overview/03_Summary_Design.md,docs/design/00_Management/01_Project_Progress.md,docs/design/00_Management/03_Task_Checklist.md, andspecs/001-rev004-accounting/contracts/rev004-traceability-matrix.md - T041 Prepare final change summary with modified files, validation results, remaining risks, and next-step suggestions in the final response for
/specs/001-rev004-accounting/tasks.md
Dependencies & Execution Order
Phase Dependencies
- Phase 1: Setup: No dependencies; MUST finish before document updates.
- Phase 2: Foundational Alignment: Depends on Phase 1; MUST finish before story implementation.
- US1 (P1): Starts after Phase 2; defines the MVP scope baseline.
- US2 (P2): Starts after US1 scope wording is stable, because interface/database alignment depends on agreed scenario scope.
- US3 (P3): Starts after US1 and US2, because ledger closure depends on settled scope and aligned formal documents.
- Final Phase: Depends on all selected user stories being complete.
Within Each User Story
- Update formal target documents before syncing contracts, quickstart, or traceability notes.
- Complete content edits before running validation commands.
- Complete validation before writing progress or checklist ledger entries.
- Complete ledger sync before final cross-cutting closure.
User Story Completion Order
US1 → US2 → US3
Parallel Opportunities
T003andT004can run in parallel afterT001andT002.T006andT007can run in parallel afterT005.- In US1,
T010andT011can run in parallel afterT009. - In US2,
T021andT022can run in parallel afterT018/T019/T020complete. - In US3,
T033andT034can run in parallel afterT030/T031/T032are scoped. - In the final phase,
T039andT040can run in parallel.
Parallel Execution Examples
User Story 1
# After T009 completes, run in parallel:
- T010 Update docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md
- T011 Update docs/design/01_Overview/03_Summary_Design.md
User Story 2
# After T018/T019/T020 complete, run in parallel:
- T021 Sync specs/001-rev004-accounting/data-model.md
- T022 Sync specs/001-rev004-accounting/contracts/if-rev-007-accounting-request.md and rev004-scenario-matrix.md
User Story 3
# After core US3 updates are planned, run in parallel:
- T033 Sync specs/001-rev004-accounting/quickstart.md
- T034 Sync specs/001-rev004-accounting/plan.md
Implementation Strategy
MVP First (User Story 1 only)
先完成 US1,把 REV-004 一期范围、排除项、审批边界和共性能力顺序稳定下来。只要 docs/design/02_Detailed_Design/12_REV_Detailed.md 与 docs/guides/REV004_ACCOUNTING_EXECUTION_PLAYBOOK.md 已可独立评审并完成最小校验,就可以形成第一版可评审增量。
Incremental Delivery
- 完成 US1,锁定一期边界。
- 完成 US2,打通详细设计、接口设计、数据库设计的一致口径。
- 完成 US3,补齐执行手册与台账闭环。
- 完成 Final Phase,做全局复核与结果汇总。
Notes
- 每个任务都必须保持单一真源模型,不得把 Archive 直接当成正式输出。
- 本 feature 未要求 TDD 或新增自动化测试,因此本任务列表不生成代码测试任务。
make check-links在多个故事中重复出现,是因为每个故事都要求独立可验收。- 若后续正式文档未实际修改,可在执行时将对应台账更新任务标记为不适用,但必须先给出理由。